Page 37 - CinemaRecord #77C
P. 37

Dress-Circle foyer/Meeting room.








                               Stairs to Circle foyer.

              In  February  1964,  a  large,  self-contained
              supper/meeting  room  was  built  at  the  rear
              of the theatre facing Grant St. The upstairs
              office/ticket box was removed and the entire
              foyer converted into an exhibition space for
              use local art groups.

              In  1965  the  Shire  of  Alberton  dissolved   The  exterior  facade  of  the  theatre  has   The  left-hand  catwalk  exit  has  been
              the Public Halls Association and took over   been  finished  in  beige  tonings.  On   closed  and  the  right  hand  exit  now
              the responsibility for the Regent.  In 1969   entering  the  front  doors  of  the  theatre  an   leads  to  a  newly  constructed  fire
              the  Shire  approved  an  extensive  two-stage   enlarged  foyer  is  found. The  old  ticket  box   tunnel,  which  replaced  the  former
              redevelopment plan for the theatre.    under  the  stairs  has  been  covered  over.       exterior stairs.

              During  1971  various  major  works  were   New  ladies,  gents  and  disabled  toilet   A  new  surround  sound  system  has  been
              completed including the extension of the   facilities  have  been  built  on  the  left-  installed  in  the  auditorium  and  a  new
              stage into the auditorium, removal of the   hand  side  of  the  foyer  in  part  in  the   roll-down   CinemaScope   screen   has
              incline  on  the  stage,  installation  of  new,   space  formerly  occupied  by  the  shop.   been fitted.
              gold  coloured  stage  curtains,  painting  of
              the foyers and auditorium in beige tonings   On the right hand side of the foyer the old
              and  the  installation  of  a  new  ducted   toilets  and  shop  have  been  removed  and
              heating  system.    Modern  light  fittings   a  new  refreshment  and  ticket  kiosk  now
              were also installed. Toilets were installed   occupies  the  space  (with  a  direct  hatch
              off the downstairs foyer (at the rear of the   servery into the auditorium).
              right hand shop).
                                                 Disabled access is now possible by means of a
              The  Stage  2  plans  were  submitted  to   lift installed in the entrance to the former shop.
              the  Health  Department  in  1978  which   An attractive Blackwood timber cladding has
              proposed new toilet blocks at the front of   been applied to the kiosk area and the support
              the theatre (this would require the removal   pillars in the foyer.  Remodelled staff service
              of the two theatre shops), the extension of   areas and a new switchboard are located on
              the stalls area into some of the foyer space   the left side of the downstairs foyer.
              and new exit stairs from the circle.  These
              plans were not implemented.        The foyer has been decorated in blue and teal
                                                 tonings with off white ceilings.  An attractive
              With  the  amalgamation  of  the  Alberton   blue carpet has also been fitted.    A timber
              Shire  into  the  larger  Wellington  Shire   chandelier, thought to be originally installed in
              (based  at  Sale)  the  future  of  the  Regent   1930, has been featured on the foyer ceiling.
              was  in  limbo  for  a  time.    The  Council  in   Similar decorative themes have been used in
              conjunction with the community conducted   the upstairs foyer.
              feasibility  studies  to  ascertain  the  viability
              of  retaining  and  refurbishing  the  theatre.   Downlights have been installed in the foyer
                                                 ceiling  to  augment  the  lighting  provided
              In 1996 the Wellington Council set up the   by  the  original  glass  fittings.    A  small
              Committee of Management for the theatre.     kiosk  area  has  also  been  included  in  the
              This  Committee  proposed  a  three-stage   foyer refurbishment.
              renovation  and  refurbishment  program
              estimated  to  cost  $500,000  -  which     The auditorium has been repainted in cream
              was approved.                      with  teal  blue  trim  to  the  woodwork.  Blue
                                                 carpet runners have been laid on the stairs and
              Alterations to the building were commenced   cross aisles. The seats at the front of the dress
              in  April  1998  and  continued  into  January   circle have been refurbished and recovered in
              1999. During this period, with the exception   blue/green  vinyl  whilst  the  rear  circle  seats
              of  the  Yarram  Eisteddfod,  the  theatre  was   remain in the former condition. The balcony
              mainly closed to the public.       now  holds a total of 287 seats.









                                                                                       CINEM AREC ORD  2013      37
   32   33   34   35   36   37   38   39   40